Operation from the overhead conductor rails at Shaw's Cove Railroad Bridge in Connecticut In the movable bridge that takes advantage of a rigid overhead rail, there is a must changeover with the catenary wire system into an overhead conductor rail in the bridge portal (the last traction recent pylon ahead of the movable bridge). Such as, the facili